Map movement across the workfront and surrounding assets.

Track supported movement and acceleration around excavation, dewatering, piling, tunnelling, heavy loading, and adjacent assets.

Starts with
A site boundary, asset geometry, and review period.
You receive
A construction-window baseline and repeat evidence review around one defined workfront and adjacent asset set.
Product output / application view
Pulse recent-change surface around an active construction workfront.
Review motion history, acceleration, temporal coherence, coverage, and asset overlap in the same spatial view.
01 / Operational outcome
What improves

Escalate field checks where construction-period movement is emerging.

The workflow is organized around one operating question: Where is supported movement emerging, which assets overlap it, and where should instruments or inspections be intensified?
Benefit 01

Extends the area reviewed beyond installed sensors

Output used

Pre-works baseline and construction-period motion history

Benefit 02

Makes change visible against a pre-works baseline

Output used

Acceleration and per-asset summaries

Benefit 03

Supports earlier, better-targeted escalation

Output used

Repeatable browser, PDF, and GIS evidence delivery

02 / Operational context
Who uses it and when

Start with the operating team, trigger, and decision.

The technical scope starts from the operating moment, available observations, site geometry, time window, and the result the team needs to use.
Teams
Owners, major contractors, project controls, adjacent asset owners, insurers, and monitoring partners.
Primary users
Project director, construction risk lead, monitoring manager, or owner’s engineer.
When it applies
High-impact works near sensitive structures, claims risk, sparse instrumentation, or a changing area of influence.
Decision to support
Where is supported movement emerging, which assets overlap it, and where should instruments or inspections be intensified?
03 / Evidence and deliverables
Configured workflow

A construction-window baseline and repeat evidence review around one defined workfront and adjacent asset set.

The workflow connects named inputs, spatial processing, technical review, and reusable outputs for a defined site state or review period.
Pulse keeps the radar history, motion products, signal quality, and supplied assets in one reviewable site record.
Output set

What the team receives to support the decision.

01

Pre-works baseline and construction-period motion history

Mapped across the available radar acquisition history for the selected review period.

02

Acceleration and per-asset summaries

Calculated over the supplied assets and site geometry for direct comparison.

03

Observability gaps and sensor/inspection follow-up areas

Displayed with temporal coherence, observation coverage, and reference-frame metadata.

04

Repeatable browser, PDF, and GIS evidence delivery

Provided in browser, document, and open spatial formats for downstream analysis.

04 / Related use cases

Bring the decision and the site evidence.
Define the record that can support it.

A construction-window baseline and repeat evidence review around one defined workfront and adjacent asset set.

Send the decision date, site or capture, review period, and the assets or work package under review. We will reply with the required inputs, processing scope, output formats, and next step.